The new site for the testing and consulting company Deloitte is being built on the last remaining construction site.
The zebra is located on the 60m wide boulevard of Frankfurt’s Europaviertel, Europa-Allee, in the so-called European Business District – ideally connected to public transport and private transport.With two underground parking levels, the ground floor and six upper floors, the new building has a gross floor area of around 26,845 square meters.The building, which is scheduled for completion in July 2020, has a high level of recognition thanks to its striking outer facade, which is designed with textile covering. It is reminiscent of the skin of a zebra and gives the building its name.

Project start: Aug 2020
Planned completion: Sep 2021

Project description

Electrical Installation for:
Power installations :

  • distributions,
  • power cables,
  • emergency lighting,
  • routes, channels, floor tanks,
  • main and control cables,
  • installation equipment,
  • equipotential bonding,
  • interior lighting,
  • exterior lighting

Low power installation:

  • fire alarm system,
  • cabling weak current,
  • antenna system,
  • EDV / TK network,
  • ELA system